Concrete sets enough to walk on in 24 to 48 hours and reaches full strength in about 28 days.
Timeline
- Walkable: 24 to 48 hours.
- Light vehicles: 7 days.
- Full strength: 28 days (about 70 percent at 7 days).
Factors
Temperature (best 50 to 90 F), moisture, mix ratio and thickness. Heat speeds it; cold slows it.

Not “drying”
Concrete hardens by hydration, a chemical reaction with water, so it must stay damp. Cure it by spraying or covering for 7 days.
Tips
Do not add extra water; it weakens concrete.

Rapid mixes
Fast-setting concrete can be walked on in 20 to 40 minutes.

Cement versus concrete
Cement is the binder in concrete (cement, sand, gravel and water).
Based on data from the Portland Cement Association and the American Concrete Institute.